Silverfish
07-29-2005, 11:56 AM
I'm due to finish a range tonight, but I'll probably be out at a concert when the range finishes, and I would like to be able to set proth sieve to start a new range (which is already reserved), when my current one is finished.
However, I would also like the new range to start a new set of files, i..e new fact.txt, SobStatus, etc, as I like to keep different ranges seperate.
An alternative would be to create a seperate instance of proth sieve in the different folder, with its own dat file, etc, and set that running with the new range. Assuming that will work, I would expect that to slow down the current range while I'm away, but I assume the combined speed should be about the same. Would that be likely to work?
However, I would also like the new range to start a new set of files, i..e new fact.txt, SobStatus, etc, as I like to keep different ranges seperate.
An alternative would be to create a seperate instance of proth sieve in the different folder, with its own dat file, etc, and set that running with the new range. Assuming that will work, I would expect that to slow down the current range while I'm away, but I assume the combined speed should be about the same. Would that be likely to work?