MAOJC
02-17-2006, 05:30 PM
February 17, 2006
Outage Notice: The project will be down starting today at 3pm PST for maintenance. The server should be back online later in the evening.
We will be updating the rosetta application today. There are a number of new features:
* Work units will have a default cpu run time of 8 hours, and users will have the option to change the cpu run time as a project specific preference. The length of work units will no longer depend on the number of predicted structures. This option was added to allow participants to reduce bandwidth usage per work unit and maintain consistent run times.
* Users will also have the option to change the frame rate and cpu use for graphics.
* A new graphics version will be available for Mac OSX users.
Outage Notice: The project will be down starting today at 3pm PST for maintenance. The server should be back online later in the evening.
We will be updating the rosetta application today. There are a number of new features:
* Work units will have a default cpu run time of 8 hours, and users will have the option to change the cpu run time as a project specific preference. The length of work units will no longer depend on the number of predicted structures. This option was added to allow participants to reduce bandwidth usage per work unit and maintain consistent run times.
* Users will also have the option to change the frame rate and cpu use for graphics.
* A new graphics version will be available for Mac OSX users.