Results 1 to 4 of 4

Thread: Work Rate

  1. #1
    Junior Member
    Join Date
    Feb 2003
    Location
    Jacksonville, Fl
    Posts
    4

    Work Rate

    To the developers...
    I'm sure this been brought up numerous times, but you need to change the way you rate client activity.
    I just noticed my client went from 250 cems/sec to 75.
    this is silly. Why measure it at all?

  2. #2
    Sieve it, baby!
    Join Date
    Nov 2002
    Location
    Potsdam, Germany
    Posts
    959
    AFAIK this way of measuring was introduced almost a year ago, in the beginning of the project. It was good for a while, but after there was a big progress in the last months and the n values increased somewhat, the correction (the 'c' in cEM) shows its deviation - which gets bigger the greater the difference between to n's is.

    A new measurement will be introduced in the next client. Louie said it'll be Flops.

  3. #3
    Senior Member eatmadustch's Avatar
    Join Date
    Nov 2002
    Location
    Switzerland
    Posts
    154
    The first mesurement was EM/s, not cEM/s. But AFAIK that wasn't a public version.
    No big deal, just thought I'd point it out
    EatMaDust


    Stop Microsoft turning into Big Brother!
    http://www.againsttcpa.com

  4. #4
    Member Cmarc's Avatar
    Join Date
    Dec 2002
    Location
    SF Bay Area
    Posts
    70
    Looking at your activity for the last 24 hours I see your GcEM total dropped by 61GcEM. This would explain the change. Not sure what the reason for this is.
    Cheers,
    Marc

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •