Results 1 to 9 of 9

Thread: SubClanks doesn't seem to tally with SubProject FDC-RAC

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Senior Member MarkRBright's Avatar
    Join Date
    Oct 2011
    Location
    West Yorkshire, UK
    Posts
    238

    SubClanks doesn't seem to tally with SubProject FDC-RAC

    I am seriously worried about the state of my brain here, but I could have sworn that over the years that I have been Boincing that I had persuaded myself that there was a very clear link between the number of Subprojects with a non-zero value in FDC-RAC and the count of SubClanks. Today I notice that I lost a SubClank but when I went to sort the SubProjects page by FDC-RAC to try and work out which one it was, I find that I have 36 positive FDC-RAC subprojects, but I only have 31 SubClanks. And it seems that it was 5 short yesterday, and perhaps for some time.
    Are SubClanks not based on FDC-RAC? Am I missing something? Have I been fooling myself all these years? Am I an idiot? Or is it just time to retire?
    If it helps, by all means check my data (MMs and SubProjects)
    Last edited by MarkRBright; 10-14-2020 at 05:21 AM. Reason: Typos

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •