Results 1 to 40 of 105

Thread: P-1 coordination thread - discussion

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Knight of the Old Code KWSN_Dagger's Avatar
    Join Date
    Feb 2005
    Location
    Western Canada
    Posts
    61
    Makes sense to me, because the next.txt file is blank. But it is at 11975918 taken from Mike's stats page. http://www.aooq73.dsl.pipex.com/2006/scores_t.htm

  2. #2
    Moderator vjs's Avatar
    Join Date
    Apr 2004
    Location
    ARS DC forum
    Posts
    1,331
    Yeah...
    If you go by this page, http://www.seventeenorbust.com/stats/rangeStatsEx.mhtml
    it's pretty obvious everything was handed out to n=12M for firstpass.



  3. #3
    Senior Member engracio's Avatar
    Join Date
    Jun 2004
    Location
    Illinois
    Posts
    237
    Quote Originally Posted by vjs
    Yeah...
    If you go by this page, http://www.seventeenorbust.com/stats/rangeStatsEx.mhtml
    it's pretty obvious everything was handed out to n=12M for first pass.



    13470000 13485000 engracio ? [reserved]


    Looks like he went above that, all the way to n=13.5m. Now the big question after everything settles down and the runaway client dropped everything is would the admin put back the dropped test to first pass. If they put it back to first pass would we be able to factor it and still get the benefits of factoring? I.e if we find a factor would the server consider it a passed test?

    Personally I do not care where we start over again as long as we do not do double work or for nothing. As what everybody has been saying, the longer the test become the more benefit p1 factoring is. With my ancient cpu's they are getting very long.

    e
    Last edited by engracio; 06-14-2006 at 08:52 AM.

  4. #4
    Moderator vjs's Avatar
    Join Date
    Apr 2004
    Location
    ARS DC forum
    Posts
    1,331
    E,

    Those tests around 13.4M are far a few between they are actually from a very old special que 13367 or something like that, I think a total of ~10 were completed.

    I can assure you that there were no tests between >12M assigned recently.

    Regardless do the range you specified if you wish, but if you havn't got that far I'd suggest taking something a little lower. By the time we get to 13.4M I'd like to see another 2 k's eliminated.

  5. #5
    Senior Member engracio's Avatar
    Join Date
    Jun 2004
    Location
    Illinois
    Posts
    237
    Quote Originally Posted by vjs
    E,

    Those tests around 13.4M are far a few between they are actually from a very old special que 13367 or something like that, I think a total of ~10 were completed.

    I can assure you that there were no tests between >12M assigned recently.

    Regardless do the range you specified if you wish, but if you havn't got that far I'd suggest taking something a little lower. By the time we get to 13.4M I'd like to see another 2 k's eliminated.
    Okay buddy make sense to me, was just not sure. I was just prepping the wu so that when the boxes running the sieving and secondpass prp completes p1 can continue.

    Let me reserve this range then:


    12000000 12020000 engracio ? [reserved

    I can always go back down to the correct prp range when this set is complete. Thanks.

    e

    ======================================

    Sounds good e.

    VJS
    Last edited by vjs; 06-14-2006 at 01:17 PM.

  6. #6

    P 1 coordination thread discussion

    I just thought Id start a thread for those of us in the Northeast to start discussing routes and movements for the project. Can everyone who is interested in the project from the Northeast chime in? The main thread for this is under the general topics forum, cycling related ? not sure, but it starts with "Wouldnt it be cool if..."

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •