I added in the results from my other post along with my new results.
Intel dual core 6600 at 2.40Ghz with 2GB system memory.
Prime95 available memory set to 1 GB.
I added in the results from my other post along with my new results.
With B1=120,000 and B2=1,700,000, Stage 1 takes 1hr 53mins, and Stage 2 takes 1hr 26mins
With B1=120,000 and B2=1,800,000, Stage 1 takes 1hr 53mins, and Stage 2 takes 1hr 32mins.
With B1=120,000 and B2=1,850,000, Stage 1 takes 1hr 53mins, and Stage 2 takes 1hr 35mins.
With B1=120,000 and B2=1,900,000, Stage 1 takes 1hr 53mins, and Stage 2 takes 1hr 35mins
With B1=120,000 and B2=2,000,000, Stage 1 takes 1hr 52mins, and Stage 2 takes 1hr 40mins.
With B1=130,000 and B2=2,000,000, Stage 1 takes 2hr 02mins, and Stage 2 takes 1hr 39mins